钢结构檩条安装施工工艺 |
添加时间:2021/10/14 16:21:42 浏览次数: |
1.1 in order to ensure the steel structure workshop installation works smoothly, ensure the quality, schedule and safety objectives of the construction, the successful completion of the project of the purlin installation work, special construction plan for the project installation. 1.2 施工方案编制主要依据为: 《钢结构工程施工质量验收规范》(GB50205—2001)、 《钢结构工程质量检验评定标准》(GB50221—95)、 1.2 the main basis for compiling the construction plan is: "code for acceptance of construction quality of steel structure" (GB50205 - 2001), "steel structure engineering quality inspection and evaluation standard" (GB50221 - 95), 1.3 钢结构屋面安装必须按施工图进行,当对施工图及在实际施工中发生疑问时,应通过技术主管或有关技术人员处理。 1.3 steel structure roof installation must be carried out according to construction drawings, when the construction drawings and problems in the actual construction, should be handled by technical directors or technical personnel. 1.4 本施工方案中的有关要求如JDG金属穿线管 不锈钢链板 隔离墩模具 检查井钢模具 流水槽模具 阶梯护坡模具 护坡砖模具 遮板模具与国家或行业标准、规范、规程有抵触时,应以前者为准。 1.4 if the relevant requirements in the construction plan are inconsistent with the national or industry standards, specifications and regulations, the former shall prevail. 1.5 安装负责人和项目经理应按照公司制定的各自的岗位职责各进其责,并协调好相互间的交接工作,保证工程安装顺利进行。 1.5 responsible for the installation and the project manager should be in accordance with the company to develop their respective responsibilities in each of their duties, and to coordinate mutual handover work, ensure the installation works smoothly. |
上一页 酚醛彩钢夹芯板是以彩色钢板为面材 |
下一页 活动房在各行业的使用 |
Copyright © 技术支持:遨游网络